Profile |
|
 |
|
|
|
|
 |
| |
|
|
|
|
|
|
|
|
1984 Established, ALLIED-TEK (THAILAND) CO.,LTD.
being sold agent for Boehler Schweisstechnik Austria GmbH.
Office at 2188/8 RamKamHaeng Rd.,BangKapi,Bangkok |
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
33/69 NaWamin Rd |
|
|
RamKamHaeng |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1988 Moved to own premise at,
33/69 NaWamin Rd.,KlongKum,BuengKum,Bangkok.
1989 Estsblished, ALLIED-TEK ENGINEERING CO.,LTD.
being for sugar cane knife & hammer production.
sold agent for FRONIUS Schweissmaschiner GmbH, for welding machines & equipment
1990 Factory floor area of 840 sq.m. (20x44m) built in TaMaKa, KarnChaNaBuRee
equiped with 30 tons overhead crane.
Welding maintenance services for wear and tear parts started.
1994 Factory floor area expanded to 2160 sq.m. (20x96m)
First entry to machinery construction, Sugar Cane Shredder size 1510x2200 mm. |
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
 |
|
|
Head Office |
|
|
Factory in Karnchanaburi |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1996 Head office moved to,21/27 moo 10 NaWaMin Rd.,KlongKum,BuengKum,
Bangkok. Factory floor area increased to 4080 sq.m. (20 x 204m)
Development and production of conveyor & transmission chains started.
1997 Enter into block rubber production process for engineering design,construction,
erection, installation and commissioning.
First world biggest block rubber milling machineries are buit, operation started from 1999.
2000 Plant 2, 20 x 126m built made factory floor area to 6.600 sq.m.
CNC machining facility installed.
2004 CNC oxyfuel gas and plasma cutting machine installed.
2005 Plant 3, 32x126m built made total factory floor to be 10632 sq.m. with employees of 250.
Atmospheric controlled heat treatmenet furnace and metallurgical laboratory facility installed. |
|
|
|